
Warehouse Tool
Takt & Lead Time
Calculate Takt Time and analyze Lead Time with VA/NVA breakdowns. Print a two-page report for the daily management board.
Takt & Lead Time
Check if you’re staffed to takt, then see where the time goes. Print a 2-page report for your board.
Inputs
Auto-saved
Results
Net Available Time
—
Takt Time
—
sec / unit
CT vs. Takt
—
Required Headcount
—
at target utilization
Assumptions
- Takt = Net available seconds ÷ Demand.
- Net time = Shift length − Breaks − Planned losses (% of net).
- Parallel stations divide effective cycle time; crew per station divides CT further if they truly work in parallel on the same unit.
- Headcount = (Effective CT ÷ Takt) ÷ Utilization.
Created by
Alexandru Valentin Sirbu