The Warehouse Framework
πŸŒ™Dark

Takt & Lead Time

Check if you’re staffed to takt, then see where the time goes. Print a 2-page report for your board.

Inputs

Auto-saved

Results

Net Available Time
β€”
Takt Time
β€”
sec / unit
CT vs. Takt
β€”
Required Headcount
β€”
at target utilization

Assumptions

  • Takt = Net available seconds Γ· Demand.
  • Net time = Shift length βˆ’ Breaks βˆ’ Planned losses (% of net).
  • Parallel stations divide effective cycle time; crew per station divides CT further if they truly work in parallel on the same unit.
  • Headcount = (Effective CT Γ· Takt) Γ· Utilization.